service disruption News Archive
Campus Power Outage – Power restored
February 21, 2018 —
Power has been restored to all buildings at Fort Garry campus after a large scale power outage
Pedestrian pathway closed
January 18, 2018 —
Between the Active Living Centre and 65 Dafoe Rd (formerly Music Building)
Shutdown of the Reverse Osmosis Water System
December 7, 2017 —
Location: Fort Garry Campus, Timeframe (est.): Shutdown Monday, December 11th, 8:00 AM and Startup Monday, December 18th, 8:00 AM, Category: Maintenance, Reverse Osmosis System Shutdown
Service Disruptions webpage will improve accessibility on our campuses
November 28, 2017 —
Stay up to date with information about campus disruptions that would impede users of all abilities to access services
SERVICE DISRUPTION – Allen Building – Elevator out of Service – 11/15/2017
November 15, 2017 —
Notice of service disruption on behalf of Physical Plant
Service Disruption: Pedestrian access into UMSU University Centre, west side Chancellor’s Circle on Nov. 18
November 10, 2017 —
Pedestrian access into UMSU University Centre will be through 200 Level East Entrance only
Medical Services Building and Brodie Building construction starts Nov. 13
November 9, 2017 —
Pedestrian tunnel will be closed from 5 p.m. to 6 a.m. each day
SERVICE DISRUPTION – Frank Kennedy – Elevator Out of Service – 11/22/2017 until 11/27/17
November 8, 2017 —
The elevators in Active Living Centre are available during this period to access the upper floors in Frank Kennedy.
Brodie centre sewer line replacement project starts Nov. 7
November 3, 2017 —
Corridor closed to all pedestrian traffic next two weeks