Construction notice: Resurfacing work at University Stadium for Canada Summer Games
July 13, 2016 —
Please be advised that phase 2 has commenced for the track resurfacing project at the University Stadium in preparation for the 2017 Canada Summer Games.
The project is expected to be completed by mid-September.
Since this is now an active construction site, unauthorized access and use of the facility is prohibited.